Scope. A practical data-collection checklist for residential Manual J work in the US. It summarizes the kinds of inputs the method uses, not the manual’s tables or procedures. Not ACCA approved or certified. Manual J is a registered mark of ACCA.

1. Before you arrive: location and design conditions

  • ZIP code or address, to pick the right weather station. Check the station is representative: a coastal or valley station for an inland or hillside house is a common source of error.
  • Outdoor design temperatures: the 99% heating dry-bulb, and the 1% cooling dry-bulb with its coincident wet-bulb (the moisture side of the cooling load).
  • Daily temperature range for the location (low, medium or high), which adjusts cooling loads through walls and roofs.
  • Elevation, if it is well above sea level. It affects air density in the load math and gas-appliance capacity later.
  • Indoor design conditions: 70 °F heating, 75 °F and 50% relative humidity cooling, unless there is a documented reason to differ.

2. Orientation and shape

  • Which way the front door faces. Every window’s solar gain follows from this. Use a compass app at the street, not a guess.
  • Floor plan sketch with exterior dimensions, number of stories and ceiling heights (note vaulted or cathedral areas separately).
  • Conditioned floor area and volume. Volume matters for air leakage.
  • Attached spaces: garage, sunroom, unconditioned basement or bonus room, and which walls and floors they share with conditioned space.

3. Walls, ceilings and floors

SurfaceWhat to record
Above-grade wallsConstruction (2×4 or 2×6 frame, masonry, SIP), cavity and continuous insulation R-values, gross area by direction.
Ceilings and roofAttic insulation depth and type, so an R-value; vaulted ceiling assemblies; roof color and material; radiant barrier if present.
Slab on gradeExposed perimeter length and any edge insulation, since slab heat loss is calculated from the perimeter.
BasementWall height below and above grade, insulation on the walls, whether it is conditioned.
CrawlspaceVented or sealed, floor insulation above it, or wall insulation if conditioned.
Floors over garages or outdoorsArea and insulation, often a bonus room’s weak spot.

Where you cannot see insulation, look in the attic, pull a switch-plate cover on an exterior wall, or check the basement rim joist. Record what you assumed when you could not verify.

4. Windows, skylights and doors

  • Size and orientation of every window, not a total. East- and especially west-facing glass carries the afternoon cooling load.
  • Glazing type: single, double or triple pane; low-e or clear; frame material. Read the NFRC sticker or the spacer etching if there is one, for U-factor and SHGC.
  • Shading: roof overhang depth and height above the window, porches, adjacent buildings, and trees that shade in summer. Interior blinds and insect screens also count.
  • Skylights, separately; they take a lot of sun for their size.
  • Exterior doors: size and type (solid, insulated, glass).

5. Air leakage

Infiltration is one of the largest inputs and one of the easiest to get wrong. In priority order:

  1. Blower-door result (CFM50 or ACH50) if one exists, from an energy audit or a new-construction test. Ask for it.
  2. Your own blower-door test if you have the equipment and the job justifies it.
  3. A construction-tightness estimate (tight, average, loose) based on age, windows, penetrations, fireplace, recessed lights and what you see in the attic. Be honest; the loosest category inflates the load fast.

How much does it matter? In one published training example from the Midwest Energy Efficiency Alliance, changing nothing but air leakage from 3 to 15 ACH50 took the cooling load of the same house from about 21,200 to about 28,200 Btuh — more than half a ton from one input.

6. Ducts

  • Location of supply and return runs: attic, crawlspace, garage, basement, or inside conditioned space. Ducts in a hot attic can add a large share of the cooling load.
  • Duct insulation R-value.
  • Duct leakage: a duct-leakage test result if there is one; otherwise note whether joints are sealed with mastic or tape, or not at all.
  • Rough layout and run lengths if you will also design or check ducts afterwards. That is the start of the Manual D work.

7. People, appliances and fresh air

  • Number of bedrooms. Manual J’s standard occupancy is bedrooms plus one, at 230 Btuh sensible and 200 Btuh latent per person, regardless of who lives there now.
  • Unusual internal loads: a home office full of equipment, a second kitchen, a large aquarium. Ordinary appliances are covered by standard allowances.
  • Mechanical ventilation: HRV, ERV, continuous exhaust or supply fans, and their CFM. Ventilation air is a load like infiltration.
  • Existing equipment nameplates, for the conversation later, not as an input. The old size is not evidence of the right size.

Where an extra five minutes pays

Not every input deserves the same care. These move the result the most:

InputWhy it swings the load
Design temperatures and stationEvery conduction and leakage line scales with the temperature difference.
Air leakageA large heating and cooling line on its own, and the source of much of the latent load.
Window area, orientation and SHGCSolar gain through glass is often the biggest single cooling line.
Duct location and leakageAttic ducts can add a large share to the cooling load; ducts inside add almost nothing.
Ceiling insulationLarge area, and the attic is the hottest surface the house touches in summer.

Interior wall finishes, the exact door count and small closets rarely change the equipment size. Spend the time on the five above.

Don’t pad the inputs

The quickest way to ruin a Manual J is a little extra on every line: a colder design day, a looser house, a few more people, leakier ducts. Each one feels like caution, and together they land the same 5-ton answer the rule of thumb would have. The method is meant to be run with honest inputs and no added margin, because equipment selection already allows some oversizing. Record what you measured, note what you assumed, and let the number be what it is. The red-flags list is the same checklist from the reviewer’s side.

Carrying it to the job

The free Manual J calculator on the homepage uses eight of these inputs — ZIP, floor area, stories, ceiling height, insulation and tightness, window area, window type and duct location — for a quick whole-house block load in the browser. The HVAC Load Calculator app takes the walk-around to the house: it works offline in basements and attics, takes more of the list in its Moderate and Pro modes, attaches tagged site photos, and turns the result into Manual S equipment sizes and a PDF report. For how much detail a job needs, see block load vs room-by-room.

FAQ

What information do you need for a Manual J load calculation?

Location and design conditions, orientation and dimensions, envelope construction and insulation, every window’s size, direction, glass and shading, air leakage, duct location and leakage, bedrooms, ventilation, and unusual internal loads.

Which Manual J inputs matter most?

Design temperatures, air leakage, windows (area, direction, SHGC), duct location and leakage, and ceiling insulation. Small details rarely change the size.

How many occupants does Manual J assume?

Bedrooms plus one, at 230 Btuh sensible and 200 Btuh latent each, on the cooling side only.

Do I need a blower door test for a Manual J?

Not required, but far better than guessing. In one published example, air leakage alone moved the cooling load from about 21,200 to 28,200 Btuh.

Should I add a safety factor to a Manual J?

No. Run honest inputs with no margin; Manual S already allows some oversizing, and padding every line compounds fast.